Client: Specialty Silicone Fabricators

Project Details

About:
A Leading Global Silicone Component Manufacturer to the Medical Device Community
Location:
Paso Robles, California
Project:
3,500 square-foot ISO 7 Class 10,000 Cleanroom, as well as 35,000 square-feet of ISO 8 Class 100,000 Cleanroom
Project Type:
Hybrid Modular Cleanroom
Industry:
Medical Device and Pharmaceutical / Biotechnology
Completed: 
May, 2012
Architect: 
James Goodman Architecture
Approximate Value: 
$3,800,000

Project Highlights

  • Conventional Construction with Modular Enhancements
  • 40,000 S.F. Walk-On Ceiling System
  • Automatic Sliding Doors
  • Red/Green Light Entry System
  • Utility Ceiling Panels with Quick-Release Connections
  • Temperature and Humidity Controlled
  • 400 Tons Chilled Water System
  • Exterior Make-Up Air Handlers
  • Interior Mezzanine-Mounted Distribution Air Handlers
  • Variable Exhaust System with Compensating Room Pressures
  • Direct Digital Control System
  • Hot Water Boiler, CDA Plant and Reverse Osmosis Deionized Water System
Client

Specialty Silicone Fabricators

Project Gallery

Project Categories

View More Projects